Feodosiya Commercial Seaport. The reconstruction of the berths №1,2,3

The first phase of the reconstruction of the waterfront (235 meters) is completed.

The project included:

  • Immersion of the groove 32 –PU (1100 tons in the bulk) with the mount of the anchoring system.
  • Outfitting of the storage platform and passages covering (9 286 m2)
  • Construction of tracks (131 m) and construction of crane runways, based on the pile foundation of pipes, which are 426 mm in diameter.

Improvement works (dredging) – 323 000 m3