About This Project
Feodosiya Commercial Seaport. The reconstruction of the berths №1,2,3
The first phase of the reconstruction of the waterfront (235 meters) is completed.
The project included:
- Immersion of the groove 32 –PU (1100 tons in the bulk) with the mount of the anchoring system.
- Outfitting of the storage platform and passages covering (9 286 m2)
- Construction of tracks (131 m) and construction of crane runways, based on the pile foundation of pipes, which are 426 mm in diameter.
Improvement works (dredging) – 323 000 m3