Pitching works on the island Zmeinyi

About This Project

The island Zmeinyi is situated in the north-western part of the Black Sea. Its territory is 20,5 hectares.

The aim of the work was to stop the wave erosion of some parts of the island coast.

The project included:

  • Building of the blocking breakwater and protecting quay-pier, made of solid masonry. The forebody comes to the depth of 10-11metres on the eastern side of the coast.
  • Building of the system of blocking breakwaters, constructed from tetrapods, located on the southern side of the island.
  • Landfilling stone works and strengthening of the bank slope on the northern side of the island.

Extensive work experience was obtained during the organization of construction works far away from the production facilities. The delivery of materials and constructions was organized only by sea. The organization of the workplace conveniences was held independently.